The project consisted of a fit-out of 3 floors of Phoenix House on Conyngham Road in Dublin 8. ...
All works were conducted within a fully operational Luxurious 5* Hotel in Dublin City Centre....
The project consisted of a full Office fit-out and complete M&E and AV installation over 3 floors. The works were focused around the following areas....
Works included stripping back of the existing space to create a new high-technology consultation suite....
Construction of new Alterations & Upgrade Construction and Fit-Out Works at the Internal Ground, First, Second & Third Floor levels along with works to the Ground Floor External Entrance area....
Complete fit-out of 100 Mount Street, Dublin 2....
The project was located in a very busy area of Dublin City Centre. Azure completed all refurbishment works within an extremely tight time frame while at the same time facilitating the Hotel's continuous operation....
Azure Contracting were approached by Intercom at the design stage of the project to work in collaboration with the design team to create an open plan, spacious, and “studio like” space (15,000 sq. ft.) with no visible spatial hierarchy....
This building comprises of 3065 sq.m in area and the scope of the project included: Accommodation for 290 staff, a variety of meeting spaces to service their company’s work patterns, staff canteen, staff exercise room, new showers/changing facilities for cyclists, and private offices reprographic areas....
CurrencyFair needed a new space to house over 125 employees and chose the team of Azure to fit-out their new office home. Construction was performed on the 1st and 2nd floors of this building....
Complete Refurbishment of 4 Storey Student Accommodation Building, located in Phibsborough, Dublin 7....
The layout for these new offices features a single facility with six buildings around a public internal street, creating a townscape which is both open and easy for visitors to navigate. ...
Our primary scope of works was to take possession of the Mezzanine floor area which was fully stripped back to its original features and convert this floor into 19 Luxury ensuite Bedrooms, a new lounge area and all ancillary facilities required to service the new bedrooms...
The fit out involved the refurbishment of the existing ground, 1st & 2nd floor plates. The existing interiors was stripped out to grey box leaving only the raised access floor....
The project involved changing the use of an existing 1071 m2 warehouse to warehouse / light industrial use and associated offices...
Azure were responsible for stripping out the existing interior decor and refurbishing the Hari Clinic an IVF centre of excellence attached to the Rotunda Hospital, this project included a complete new reception area incorporating a glazed screen meeting room....
Azure Contracting completed all refurbishment works within an extremely tight time frame while at the same time facilitating INTREO's continuous operation. Azure Contracting acted as main contractors on this project and also took on the role of PSCS....
The fit out of a two storey shell and core property located in Carrick on Shannon, Co. Leitrim...