We are committed to producing solutions for refurbishment and fit-out environments that exceed client expectations.

Phoenix House

The project consisted of a fit-out of 3 floors of Phoenix House on Conyngham Road in Dublin 8. ...

See project

Morrison Hotel

All works were conducted within a fully operational Luxurious 5* Hotel in Dublin City Centre....

See project

Birch House

The project consisted of a full Office fit-out and complete M&E and AV installation over 3 floors. The works were focused around the following areas....

See project

Hermitage Clinic

Works included stripping back of the existing space to create a new high-technology consultation suite....

See project

Osprey Hotel Spa

Construction of new Alterations & Upgrade Construction and Fit-Out Works at the Internal Ground, First, Second & Third Floor levels along with works to the Ground Floor External Entrance area....

See project

Liferay

Complete fit-out of 100 Mount Street, Dublin 2....

See project

Morgan Hotel

The project was located in a very busy area of Dublin City Centre. Azure completed all refurbishment works within an extremely tight time frame while at the same time facilitating the Hotel's continuous operation....

See project

Intercom

Azure Contracting were approached by Intercom at the design stage of the project to work in collaboration with the design team to create an open plan, spacious, and “studio like” space (15,000 sq. ft.) with no visible spatial hierarchy....

See project

Fineos

This building comprises of 3065 sq.m in area and the scope of the project included: Accommodation for 290 staff, a variety of meeting spaces to service their company’s work patterns, staff canteen, staff exercise room, new showers/changing facilities for cyclists, and private offices reprographic areas....

See project

CurrencyFair

CurrencyFair needed a new space to house over 125 employees and chose the team of Azure to fit-out their new office home. Construction was performed on the 1st and 2nd floors of this building....

See project

Broadstone Hall

Complete Refurbishment of 4 Storey Student Accommodation Building, located in Phibsborough, Dublin 7....

See project

Wexford County Council

The layout for these new offices features a single facility with six buildings around a public internal street, creating a townscape which is both open and easy for visitors to navigate. ...

See project

Westin Hotel

Our primary scope of works was to take possession of the Mezzanine floor area which was fully stripped back to its original features and convert this floor into 19 Luxury ensuite Bedrooms, a new lounge area and all ancillary facilities required to service the new bedrooms...

See project

REHAB Group Ltd

The fit out involved the refurbishment of the existing ground, 1st & 2nd floor plates. The existing interiors was stripped out to grey box leaving only the raised access floor....

See project

Avid

The project involved changing the use of an existing 1071 m2 warehouse to warehouse / light industrial use and associated offices...

See project

The Hari Clinic, Rotunda Hospital

Azure were responsible for stripping out the existing interior decor and refurbishing the Hari Clinic an IVF centre of excellence attached to the Rotunda Hospital, this project included a complete new reception area incorporating a glazed screen meeting room....

See project

Intreo Newbridge

Azure Contracting completed all refurbishment works within an extremely tight time frame while at the same time facilitating INTREO's continuous operation. Azure Contracting acted as main contractors on this project and also took on the role of PSCS....

See project

VistaMed

The fit out of a two storey shell and core property located in Carrick on Shannon, Co. Leitrim...

See project